Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interactive-geo-maps domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Lux Our Place - B Squared

B Squared

PROJECT & COST MANAGEMENT

Lux Our Place

Property
LUX12, LUX 14 and LUX16, Kirchberg Campus, Luxembourg

Building Area Approximately 10.150 sqm

Sector
CAT B Fit-out

Description of Work

The aim of the project was to implement Agile working way throughout the LUX Campus. A higher HC to desk ratio was approved with each team which allowed for the introduction of new collaborative workspace options within the area.

The project was looking at changing the furniture and décor of the offices and upgrading the standard of working conditions for the workers.

The offices were refurnished with some minor modification to the layout and the erection of several partitions. Carpeting were changed along with the wall coverings and finishes.

The desks were changed to a new height and an adjustable model with smaller dimension coupled with lockers and team workspace.

It also allowed for future team growth considering the newly introduced shared ration while remaining in the same location.

The GC was selected via a Two Stage competitive tender.

The Construction works started in August 2019 on LUX 12, in October 2019 on LUX 14, in November 2019 on LUX 16  and the last building was successfully completed in February 2020